Construction
Gallery
The following
links record the construction of Euro-MARS at the Rio Grande Company's
facilities in Denver, Colorado, during 2002.
May 21st 2002
Hab
with most wall panels removed and dome frame under construction
Closer view of dome frame
under construction
The hab dome frame
View of the
underside of the dome frame
Fitting
the landing leg stays
Hab view showing
the single wall panel and dome frame
Six wall
panels laid out on the ground
May 15th 2002
Three
wall panels raised
Side view of
hab frame with three walls erected
A view from
inside the hab with the three wall panels raised
Closer view
of the three wall panels, showing airlock door opening
View of the hab with the
wall panels from the other side
Looking through
the doorless opening of the airlock
Eight wall panels
up viewed from the East
Eight wall panels
up viewed from the South-east
Eight wall panels
up viwed from the South
A closer view
of the hab from the West
A view of the
hab from the North-west, looking across the lower deck to the raised wall
panels
A closer view of the hab,
looking across the lower deck
May
14th 2002
Wall
sections with window frames fitted, awaiting insulation
Wall sections
with window frames and insulation
Wall sections ready
for mounting on hab
Upper deck floor
beams ready for installation
May
13th 2002
Hab
with wall panels mounted on frames
Hab with wall sections awaiting
insulation in the foreground
Wall sections
awaiting foam insulation
Wall panel frame with
door frame inserted
May 10th 2002
Preparing
to fit wall panels to frames
Fixing wall panels
to frames
Insulating the
wall panel units
Insulating the
under-floor space beneath the lower deck
May
9th 2002
Hab
with mid-deck flooring outer raduis installed
View of installed
wall panel frames
Close-up of installed lower
deck floor panels
Installing mid-deck
floor panels
View up from
lower deck to mid-deck
May 2nd 2002
View
of hab: 2 wall panels raised and mid-deck floor beams in place
Close-up
showing lower deck floor panels and mid-deck floor beams
Wide
shot looking up at mid-dek floor beams
Close-up of mid-deck
floor beams
May 1st 2002
Wide
shot of hab showing raised wall panel frames
View of completed lower deck
floor panelling
Side shot of hab structure
with raised wall panel frame
April 30th 2002
Detailed
view of mid-deck showing floor beams in place
View from across the lower
deck looking at raised wall frames
View of wall panel
frames from outside the hab
Looking up at wall panel
frame extending above mid-deck level
April 26th 2002
The
stack of wall panel frames
Lower deck with
outer floor radius installed
Close-up of outer
floor radius
View
of completed lower deck floor beams
Hab at the end of the day
April 25th 2002
The
growing stack of wall panels
Close-up of lower
deck floor "wedges"
First lower deck floor raduis
fitted
Hab at the end of the day
April 24th 2002
The
growing stack of wall panels
A "wedge"
of floor beams installed
Hab at the end of the day
April 23rd 2002
The
first wall panel frame
Lower Deck floor
beams being fitted
Another
view of floor beams being fitted with end radius test-fitted
Hab at the end of day
April 22nd 2002
Lower
deck cross-members bolted to central pillar
Mid-deck cross-members
bolted to central pillar
Low angle looking up at
a landing leg
Close-up of join
between landing leg and lower deck cross-member
View of join between
landing leg and mid-deck cross-member
Hab at the end of the day
|